ROADMAP

Below we have our current TODO list, ordered via priority and our CHANGELOG with the latest project changes.

TODO

The current development (TODO) roadmap:

  • Docs for Models, Api, Install Instructions, Docker Image, pip install.

  • Docker image available at DockerHub (Uploaded via TravisCI build).

  • Cookbook: docker-compose services.

  • Add .jsx processor

  • Split React JSX code in modules/imports

  • Freeze versions and upload to pypi

  • Enable Pull Request interaction with Travis CI

  • Run the project demo without a existing project

    • django-admin -m meeting.gate
    • Add docs instructions
  • Add auth to views (Browser and Backend/API).

  • Upgrade react code to latest version.

  • Split react code in modules, add imports (Depends requirejs).

  • Convert react code to ES6.

  • Wristband roles, allow access in different spots.

  • Add command and instructions of how to load tickets form meeting-shop.

    • Explain the possibility of load data from other systems (Explain the models).
  • Add integration with meeting-shop:

    • Command
    • Tasks

CHANGELOG

This document records all notable changes to meeting-gate. This project adheres to Semantic Versioning.

v1.0.0-dev (unreleased)

Added:

  • Backend code
  • Browser tests.
  • Docs content.

v0.0.1 (2017-12-19)

Added:

  • Basic project structure,

<v0.0.1

The before times1, like 65,000,000 BCE.